New Delhi: SpaceX has installed hundreds of thousands of Nvidia GPUs in its data centres in Memphis, Tennessee that it expanded. Google already leases approximately 110,000 of the chips for about $920 million every month through mid-2029, according to a posts summary on X. The move is said to involve approximately 325,000 GPUs and would cost roughly $3.1 billion per month if it is implemented at full capacity. Both estimates are based on a Grok-produced compilation of social media posts that warns it might be inaccurate, and have not been independently verified.
If the numbers are accurate, the two deals equal approximately $4 billion per month, or nearly $48 billion per year. Then it’s a serious business for a company, best known for rockets and satellites, to lease computers.
Rivals Under One Roof
Google and Anthropic are major rivals in the field of AI models, but they need the same provider for the raw capacity. Google is building its own chips, and has a big cloud business, so even the biggest players can’t keep up the pace, it seems. There is more demand than supply for training capacity and buyers are seizing power where they can.
The price of “large, high-bandwidth clusters,” which are ideal for training frontier models, is reportedly rising, leading Musk to point to this as a reason for the price increase. According to the same posts, the advantage that SpaceX has is speed. It rolled out Colossus fast and a bunch that is running is worth more than a good bunch that comes next year in this market.
Why Rent Instead of Build
Customers benefit from renting because it can save them a lot of upfront investment, long construction periods, and the possibility of an older, less usable piece of hardware. Overall a multi-year lease (2029) locks in capacity without requiring the buyer to actually operate a data centre. For the landlord, it’s a business deal that is enticing. Based on these facts, Google’s lease rate is about $8,400 per GPU per month and Anthropic’s is nearly $9,500 per GPU per month. Analysts say compute leasing is a high-margin business, and a facility can quickly recoup its hardware investment.
As Nvidia ramps up its chip sales, prices are rising. That’s because the new chips are being absorbed by increasingly large training sessions, which has not resulted in a lower price for rentals. The number of GPUs is no longer as important as cluster size, quality of networking and power access.
A Dilemma Over Grok
The offers present Musk with a problem. Each GPU leased to Google or Anthropic is a GPU that is not being used to train the chatbot that Anthropic’s own AI firm has created: Grok. Leasing adds a steady income and holding capacity back might be beneficial to Grok in catching up with competitors. His ability to tilt the scales one way or the other will be a sign of whether he is a player in AI or he’s the one that is serving everyone else.
The Power Question
There is another perennial issue with Colossus, namely electricity. These clusters consume huge amounts of power and have been a cause for concern for the residents of Memphis and its regulators about how they are being supplied and how they impact air quality and the grid. More capacity for outside customers will only focus those concerns, and permits and power contracts could cap SpaceX’s growth rate.
Bigger Than Rockets?
If the compute leasing business does become a 10s of billions of dollars per year business, it may eventually compete with the launch business which relies on relatively few missions. A data centre’s rent does not run on a monthly basis and has no timeframe for it to be launched. It will also change hands which will win the AI race. With the model builders, another class of claimants is also coming into existence: infrastructure owners who charge fees to any and all participants, regardless of who wins.
At this time, the image is limited to unverified summaries and posts. The terms have not been confirmed by SpaceX, Google nor Anthropic and the actual figures may differ. The directions are clear, however: In the AI economy, the ownership of the machines may go hand-in-hand with the construction of the models running on them.


